![]() Includes AS/NZS 3000:2018 Guidance Notes, AS/NZS 3000:2018 Swimming and Spa Pools Explained and AS.NZS 3000:2018 Documentation AS/NZS 3000:2018 (including A1 Amendment), Electrical installations (Known as the Australian/New Zealand Wiring Rules).AS/NZS 2293.2:2019, Emergency evacuation lighting for buildings – Routine service and maintenance.AS/NZS 2293.1:2018, Emergency escape lighting and exit signs for buildings – System design installation and operation.Once registered, members will need to log in using the email address and password set by SAI Global at time of registration. Members can access the Standards here.īecome a Master Electrician today to gain access, along with unlimited access to our Workplace Relations, Safety and Technical Advice hotline, tools to improve your business performance and exclusive member savings.īecome a Master Electrician | Member Standards Access Note: SAI Global will require each member to register (one-time only per device) with their first name, last name and email address. The deadline date for comments to Standards Australia being Monday the 20th of June, we would appreciate any feedback to be sent to by the end of this week, Friday the 17th of June.MEA and SAI Global have partnered to provide Master Electricians with complimentary access to 21 selected Australian Standards including AS/NZS 3000:2018 (Amended) and AS/NZS 5139:2019 from 1 July 2020. The draft standard is available for free download and public comment on Standards Australia's website. We comment that New Zealand should not be tied to this requirement, as the NZ Electricity (Safety) Regulations 2010 already sets out the requirements for such installations. Clause 7.8.2.9 on the requirement for high voltage electrical installations to comply with AS 2067.We recommend the reference to the yellow colour to be removed from the standard, to avoid any confusion with the yellow that, together with red and blue, used to be commonly accepted for three-phase conductors. This would suggest that conductors with yellow insulation would be reserved for earths. These terms are reserved for prescribed electrical work in New Zealand, we therefore proposed different wordings where 'connect' and 'disconnect' do not refer to prescribed electrical work.Ĭlauses 3.8.1 and 3.8.3.3 on the colours not to be used for active conductors. The EEA submission focuses on three key points:Ĭlauses 1.4.14 and 1.5.5.3 on the use of the terms 'connect' and 'disconnect' when referring to automatic disconnection devices. The EEA has prepared a draft submission on the draft AS/NZS 3000:2016 Electrical installations, available here for members to comment. Safety in Design (SiD) Training - OnlineĭR AS/NZS 3000:2016 Electrical Installations - Draft EEA submission for comment.Power System Earthing Course - Overview.ESI Overhead Line Design Micro-Credential.Incident Cause Analysis Method (ICAM) Courses - Overview.National Equipment Defect Reporting System (NEDeRS®).Electricity Supply Industry (ESI) - WORKPLACE Safety Strategy to 2020.ESI Safety Performance Indicators Resources.Safety Alert - Accident & Incident Reports.EEA Submissions on Public Consultations.Generation Procedures Group (GPG) Documents.Safety Manual - Electricity Industry (SM-EI).Safety Alerts - Accident & Incident Reports.Annual Power Engineering Exchange (APEX) Forums.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |